Skip to content

Our Projects
O'Brien Traffic

Our Projects

Surf Coast Community & Civic Precinct

Surf Coast Community & Civic Precinct

Project: Traffic and parking study of the precinct including the impact of the proposed Aquatic and Recreation Centre 

For: Surf Coast Shire Council

When: 2023 & 2025

Nelson Road, Box Hill

Nelson Road, Box Hill

Project: A series of projects that (1) investigated pedestrian and cyclist safety, producing recommendations, plans, and visualisations for improvements, and (2) developed recommendations to enhance traffic safety and movement through the local area.

For: Whitehorse City Council

When: 2021 - 2024

Croydon Community Wellbeing Precinct

Croydon Community Wellbeing Precinct

Project: Traffic Impact Assessment, Waste Management Plan and Green Travel Plan for a Council Hub, auditorium, childcare centre and community facilities. 

For: Council appointed Architectural Firm

When: 2023 - 2025

Berwick Medical Centre

Berwick Medical Centre

Project: Traffic Impact Assessment, Car Parking Demand Assessment, Car Park Design 

For: Private Client

When: 2022

Wickham Road, Hampton East

Wickham Road, Hampton East

Project: Road safety audit of a concept design for a new school crossing on Wickham Road near the Worthing Road roundabout and level crossing. Audit recommendations were adopted in the final design.

For: Bayside City Council

When: 2025

School Active Travel Plans

School Active Travel Plans

Project: Better Moves Around Schools - school neighbourhood plans for Essendon, Keilor Road/Essendon North and Niddrie/Essendon West neighbourhoods to improve safety, accessibility and attractiveness of walking and riding to and from schools.

For: Moonee Valley City Council

When: 2025

Sunbury Road Duplication

Sunbury Road Duplication

Project: Temporary Traffic Management Design for the major road duplication project.

For: Road Construction Company

When: 2021 - 2023

Red Cliffs Walking and Cycling Plan

Red Cliffs Walking and Cycling Plan

Project: Preparation of a Walking and Cycling Plan, developed in partnership with the local community, to enhance safety for pedestrians and cyclists while promoting increased active transport.

For: Mildura Rural City Council

When: 2024 - 2025

Frankston Bike Riding Strategy

Frankston Bike Riding Strategy

Project: Development of a Bike Riding Strategy and Action Plan to guide Council in the delivery of initiatives over the next 15 years.

For: Frankston City Council

When: 2024

High Street / Coburns Road, Melton

High Street / Coburns Road, Melton

Project: Temporary Traffic Management Design for the upgrade of this intersection.

For: Road Construction Company

When: 2024

Bendigo Road Safety Action Plan

Bendigo Road Safety Action Plan

Project: Preparation of the Greater Bendigo Road Safety Action Plan 2023–2027 to guide delivery of road safety activities that respond to community needs.

For: City of Greater Bendigo

When: 2021 - 2023

Compact Roundabouts Evaluation

Compact Roundabouts Evaluation

Project: Evaluation of lower-cost compact style roundabouts and development of design guidance to support their use as safer, cost-effective intersection treatments.

For: Victorian Department of Transport and Planning

When: 2024 - 2025

Sinclair Street, Drouin

Sinclair Street, Drouin

Project: Design and costing for a raised pedestrian crossing.

For: Baw Baw Shire Council

When: 2021 - 2022

Alphington Road Safety Study

Alphington Road Safety Study

Project: Investigation of road safety issues and development of a Road Safety Plan setting out recommended treatments

For: Yarra City Council

When: 2024

Melbourne Road / Ferguson Street, Williamstown

Melbourne Road / Ferguson Street, Williamstown

Project: Modelling options to improve pedestrian access at the existing roundabout

For: Victorian Department of Transport and Planning / Council

When: 2024

Sandringham Golf Precinct

Sandringham Golf Precinct

Project: Car Parking and Traffic Impact Assessment for current and future operations.

For: Sandringham Golf Club and Royal Melbourne Golf Club

When: 2019 - 2020

Windemere Residential Subdivision

Windemere Residential Subdivision

Project: Traffic Assessment for a 4,700 residential lot subdivision.

For: Private Client

When: 2018 - 2019

Noble Park Residential development

Noble Park Residential development

Project: Swept path analysis for proposed car spaces

For: Private Client

When: 2020

Caroline Springs Pedestrian and Access Mobility Plan

Caroline Springs Pedestrian and Access Mobility Plan

Project: Preparation of plan that connected nine residential precincts to the Caroline Springs Town Centre via active travel.

For: Melton City Council

When: 2019 - 2020

Heathdale Christian College, Werribee

Heathdale Christian College, Werribee

Project: Traffic and Parking Assessment for the school masterplan.

For: Heathdale Christian College

When: 2019

Twelve Apostles Trail

Twelve Apostles Trail

Project: Traffic Engineering Design and Safe System Assessment for the proposed Twelve Apostles Trail between Port Campbell and Timboon.

For: TBLD

When: 2020

Sydney Motorway Modelling

Sydney Motorway Modelling

Project: Investigations to improve on-ramps, off-ramps and mainline capacity for various motorways.  

For: RMS NSW

When: 2016 - 2020

Livestock and Container Truck Assessment

Livestock and Container Truck Assessment

Project: Assessment of livestock and container trucks to better understand their performance at different masses, including dynamic vehicle performance comparisons and infrastructure (pavement/bridge) impacts.

For: RMS NSW in conjunction with ARRB

When: 2019 - 2020

Waste Collection Design for Multi-Unit Developments

Waste Collection Design for Multi-Unit Developments

Project: Preparation of common waste collection vehicle templates and height clearance requirements. 

For: Moonee Valley City Council

When: 2018 - 2019

Industrial / Warehouse Development, Truganina

Industrial / Warehouse Development, Truganina

Project: Traffic and Parking Assessment for a 54,000m2 industrial / warehouse building

For: Private Client

When: 2017 - 2019

Preston Mixed Use Development

Preston Mixed Use Development

Project: Traffic and Parking Assessment for 60+ apartments and retail development.

For: Private Client

When: 2017 - 2019

Truck Performance Modelling

Truck Performance Modelling

Project: Vehicle dynamics modelling of heavy vehicle combinations under the Performance Based Standards (PBS) scheme or other criteria (such as vehicle stability or swept width).

For: Heavy vehicle operators, trailer manufacturers, road managers

When: Ongoing

Electric Vehicle Charging

Electric Vehicle Charging

Project: Preparation of background paper and policy for the placement of vehicle charging stations within the public realm.

For: City of Greater Dandenong

When: 2019

Bicycle Corridor Designs

Bicycle Corridor Designs

Project: Preparation of functional and detail designs for bicycle facilities along two corridors.

For: Whitehorse City Council

When: 2017 - 2020

Altona Residential Development

Altona Residential Development

Project: Traffic and Parking Assessment for 20+ dwellings and retail development.

For: Private Client

When: 2019 - 2020

Solar Farm, Northern Victoria

Solar Farm, Northern Victoria

Project: Traffic Assessment for the development of a solar farm with over one million solar panels.  

For: Private Client

When: 2020

Brewery and Taphouse, Carrum Downs

Brewery and Taphouse, Carrum Downs

Project: Traffic and Parking Assessment for an increase in patrons.

For: Dainton Brewery and Taphouse

When: 2019

On-Street Car Parking for Share Vehicles

On-Street Car Parking for Share Vehicles

Project: Preparation of background paper and policy for on-street parking allocated for car sharing. 

For: City of Greater Dandenong

When: 2019